Retrofit & Addition Elevator
Retrofit & Escalators

Retrofit & Addition Elevator

Lifts for buildings that were built without them — with self-supporting shafts that carry their own loads.

Retrofit & Addition Elevator manufactured by SULING Express Elevator
RetrofitSelf-supporting shaftNo load transferModernisation

Retrofit and addition elevators bring lift access to buildings that were built without it. We design self-supporting steel shafts that carry all lift loads, coordinate structural interfaces with the existing fabric, and supply the equipment, drawings and installation method statement as one package.

ShaftSelf-supporting steel
Load transferNone to structure
Typical build6–10 weeks
Site install7–20 days
ComplianceStructural drawings
ScopeDesign + supply + install
Engineering notes

The problem is the building, not the lift

Adding a lift to a finished building means solving four problems at once: where the shaft goes, how its loads reach the ground, how the landings connect to existing floors, and how residents keep using the stairs during construction.

Our approach is a self-supporting steel shaft — a lattice or portal frame founded on new pad footings, carrying the lift, its loads and the cladding, and connected to the building only at the landings with movement-tolerant details. The existing structure takes no lift load, which is usually what makes the project approvable.

Coordinated with the way people live

Work is phased so that the stair remains usable throughout. Structural steel is erected from outside where access permits, and the shaft is clad before the internal fit-out begins, keeping dust and noise out of the building.

Landing doors are set into the existing walls with minimal breaking out, and the finishes around them are made good to match. Where a landing connects to a half-flight, we adjust the shaft position rather than rebuild the stair.

Standard specification at a glance

ParameterValue
Shaft structureSelf-supporting steel lattice or portal frame
FoundationsNew pad footings, designed to soil report
Connection to buildingLanding level only, movement-tolerant details
Load transfer to existing structureNone
CladdingSteel, aluminium composite or glass
Typical erection period2–4 weeks (structure)
Typical fit-out period3–6 weeks
Site installation7–20 working days
Scope of supplyDesign, steelwork, lift equipment, installation, commissioning
DocumentationStructural calculations, shaft drawings, method statement, O&M manual
ComplianceLocal code compliance and inspection support
OptionsGlazed shaft, through-car, machine-room-less lift

Values shown are typical for the standard configuration. Final data are confirmed on the approved layout drawing for each project.

Modernisation of existing equipment

For buildings that already have a lift, we modernise rather than replace: new gearless machines and VVVF controllers, replacement door operators, light curtains, car interiors and landing indication. The existing shaft and guide rails are surveyed and reused wherever they meet tolerance.

Modernisation typically cuts energy consumption by 30–50%, reduces breakdown frequency and brings the installation up to current safety standards — at a fraction of the cost of a new lift, and with far less disruption to occupants.

Technical data

Full specification

Typical values for the standard configuration. Options and project-specific variants are confirmed on the approved layout drawing.

ParameterStandard value / option
Shaft structureSelf-supporting steel lattice or portal frame
FoundationsNew pad footings, designed to soil report
Connection to buildingLanding level only, movement-tolerant details
Load transfer to existing structureNone
CladdingSteel, aluminium composite or glass
Typical erection period2–4 weeks (structure)
Typical fit-out period3–6 weeks
Site installation7–20 working days
Scope of supplyDesign, steelwork, lift equipment, installation, commissioning
DocumentationStructural calculations, shaft drawings, method statement, O&M manual
ComplianceLocal code compliance and inspection support
OptionsGlazed shaft, through-car, machine-room-less lift
Questions

About this model

No. The shaft is self-supporting and founded on its own footings; the existing structure carries only the landing connection loads, which are typically negligible. We provide the structural calculations for approval.

Structure and cladding typically take 6–10 weeks including foundations, and lift installation 7–20 working days. The programme depends mainly on foundation conditions and access for steel erection.

Yes, and it is often the better value. We survey the shaft and guide rails; if they are within tolerance we reuse them and replace the machine, controller, doors and car interior.

Related models

You may also consider

Compact Home Lift
Residential

Compact Home Lift

Minimum-shaft lift for houses where the stair void is the only space.

View Details
Traction Villa Elevator
Residential

Traction Villa Elevator

The standard villa lift, often installed inside the new steel shaft.

View Details
Panoramic Elevator
Architectural

Panoramic Elevator

Glazed cars for retrofit shafts that are visible from the street.

View Details
Next step

Request a specification for your project.

Send the shaft dimensions, floor heights and intended use. Our engineers return a layout drawing, a component specification and a delivered price — usually within one business day.